BOQBook

Bill of Quantities

Stop Disputing Quantities. Start Certifying Bills.

BOQbook gives your site team a structured way to record measurements, your client a clean portal to approve them, and your accounts team an invoice they can post — all on one audit-trailed record.

The problem

Today the RA bill is an Excel sheet, printed and emailed.

A backup, over email

Each cycle the measurement sheet is sent as an attachment — the record of what was billed lives in an inbox, not a system.

No record of change

When a quantity is revised there is no line-level history: the previous value is overwritten and the reason is lost.

Slow, disputed, re-worked

Certifiers re-measure from scratch, disputes stall payment, and the same quantities get re-keyed across estimate, bill and invoice.

The record

Quantity accumulation & reconciliation, per BOQ line.

Every measurement accrues against the BOQ line it belongs to. This cycle's quantity adds to the running cumulative, the rate comes from a known SOR, and the amount falls out — auditable to the entry, never re-keyed.

ItemDescriptionUnitSOR ratePrevThis cycleCumulativeAmount
2.3.1Earthwork in excavation for foundation412.00180.0064.00244.00₹1,00,528
4.1.2PCC 1:4:8 in foundation5,240.0022.008.0030.00₹1,57,200
5.2.4RCC M25 in footings & pedestals8,110.0040.0012.5052.50₹4,25,775
6.1.1TMT reinforcement, cut, bend & placet78,900.006.201.808.00₹6,31,200
7.3.2Brickwork 230mm in CM 1:66,480.000.0034.0034.00₹2,20,320

The workflow

Baseline BOQ to approved tax invoice, in ten controlled steps.

01

Freeze the baseline BOQ

Lock the agreed scope and quantities as the reference every cycle bills against.

02

Bind SOR rates

Pin each line to a known SOR edition so rates are never entered by hand.

03

Withdraw measurements once

Capture site quantities a single time, against the line they belong to.

04

Accrue to the BOQ line

This cycle's quantity adds to the running cumulative automatically.

05

Reconcile the cycle

Cumulative, previous and this-cycle values are checked line by line.

06

Record every change

Revisions keep line-level history and the reason they were made.

07

Certify quantities

The certifier signs off the cycle's measured quantities, not a re-measure.

08

Generate the RA bill

The running account bill falls out of the reconciled quantities.

09

Approve to tax invoice

An approved RA bill becomes the tax invoice with no re-keying.

10

Export the backup pack

A frozen, auditable backup pack for the cycle, ready to hand over.

End to end

From baseline BOQ to a frozen backup pack.

Stage 1

Project commercial baseline

The frozen BOQ and bound SOR rates every cycle is measured and billed against.

Stage 2

Measurement control

Withdraw-once quantities accrued to each line, with reconciliation and change history.

Stage 3

Running account billing

RA bills generated from certified quantities — no spreadsheet, no re-keying.

Stage 4

Audit & export

Approved invoices and a frozen backup pack, traceable line by line.

Who it's for

Built for the people who own the quantity.

What Bill-ready is

  • A single controlled quantity record per BOQ line
  • Rates bound to a known SOR edition
  • Line-level change history you can defend
  • Certified quantities that flow straight to the RA bill
  • A frozen, auditable backup pack every cycle

What it is not

  • A general-purpose spreadsheet or PDF tool
  • A re-measurement or estimating package
  • An accounting or ERP system
  • A document store for emailed attachments

“It assists with mapping and structure. The engineer stays the final authority — every number is traceable to a human entry.”

The pilot

Prove it on one live project, one billing cycle.

30 days
One billing cycle, start to finish, on a project you already run.
One line
Begin with a single BOQ line if you want — the model holds at any scale.
Your rates
Bound to the SOR edition you already bill against, not a generic list.

Get your next bill out clean.

Reconciled quantities, rates bound to a known SOR, and a backup pack that ties out line by line — from one live project.